I don’t have a lot of experience in commissioning work from other people. This month I’ve had Z, who has helped me around the house with some general tasks, R who’s replaced the distribution board and wired up the pump and then finally E and his assistant. I found E driving back from the supermarket to get sandwiches and so now I have some limited experience.
Maybe the first thing that comes to mind is that E turned up just after 8:00 on Friday morning. A good hour and 45 minutes to two hours ahead of the start times for the other two. That means he probably got up around 6, had some breakfast, packed lunch, got everything ready, and then shot out to get to my house for 8:00am. I appreciate that and enjoy that that he was here bright and early.
He was also entirely uninterested in chit chat. He looked at the work, made a plan inside of his head then got on with it. He worked carefully, asked me questions when he needed me to make decisions, but he kept those to a level I was comfortable with. They worked hard the whole time. I don’t think there was a moment when I thought, wow, these guys are just slacking or they’re thinking. No, he just got on with it. They set up a mixer in the front garden so they can make mortar. The two of them work so well together as a team. I was really impressed. They just always seem to know what the other person was going to be needing. They communicated neatly and efficiently.
I liked it. The whole experience and since I had to leave a little bit early. I paid them and left a few notes for the last piece of work and then I just got on and I could tell that they were interested in the outcome of their work because they left some notes for me when they left. They gave me some advice about what I needed to do to look after the work properly. I didn’t know brickwork needs about 28 days to achieve a good proportion of its final strength for example. There are a couple of bits that they weren’t entirely happy with. They let me know about those and said what I needed to do just to tidy them up. In this case it was a little bit of mortar. They found when they were setting the engineering bricks in such cold, wet weather the mortar was flowing a little and so they couldn’t scrape it back as much as they wanted to. So they gave me some notes about how to tidy it up and sort it out before it fully set.
Having worked with E I find my expectations have climbed a little. They really highlighted to me how different employees can be. And I guess every manager must have this same experience. They have a team of people working for them, some of whom are just super willing and diligent and crack on, and others who are less so. You might be a pretty good employee, but if in the context of things, you’re at the bottom of that list, whoa, you’re in trouble.
In terms of progress on the house then. E knocked out the window and reduced the size of that frame. I will measure and order a new window on Monday. I need to get it ordered so I can get it fitted and warm the house back up again. The other thing that happened is that they bricked up the doorway into the kitchen. So my kitchen diner now has one door that comes into it. They also built the brick based for the heat pump.
I’m really pleased about that and I will message them shortly after I’ve written this entry just to ask if I can now put the heat pump on top of that stand, because if I can, then that that means I know where its final location is going to be, which is great news.
Leave a Reply
You must be logged in to post a comment.